Meeting:2013/05/09: Difference between revisions

From SUWS-wiki
 
Line 69: Line 69:
** Slim jims? Some still under construction.
** Slim jims? Some still under construction.
** Dummy Loads
** Dummy Loads
*** Murray, Henry & Helios ==> Helios to send details to scorpia
** Yagis
** Yagis
** Schmendrick is interested in designing a CW HF rig.
** Schmendrick is interested in designing a CW HF rig.
Line 77: Line 78:
** Operating afterwards?
** Operating afterwards?
* '''Submit your availability [http://doodle.com/xun3gpsa926asdht here]'''
* '''Submit your availability [http://doodle.com/xun3gpsa926asdht here]'''
* Power Boxes
** Budget
** Schmendrick to figure out how this could be designed.




* FT-920 Case - [http://www.suws.org.uk/File:FT920_Case.jpg Photo]
* FT-920 Case - [http://www.suws.org.uk/File:FT920_Case.jpg Photo]


* AOB
* AOB - NOB


== SOWN ==
== SOWN ==

Latest revision as of 18:43, 9 May 2013

[[|]] | Current Meeting:

 | 

[[|]]

Meeting (to be) held from 18:00-20:00 on 2013/05/09 in Zepler CLS Lecture Room

 

Amateur Radio

18:00-19:00 G3KMI Meeting

  • Repeater sites
  • Zepler WebSDR+Discone
    • Still waiting for ECS to respond - H&S Audit


  • 80m CC Debrief
    • Noise floor - loop antenna next time?
    • Extreme narrowband on the Antenna
      • Solution could be a dipole
    • Explore the use of the top of the Physics building. helios to follow up.
    • Next time, we should use the club rig or shack-in-a-box.
    • MORE POWERRRRRR! (Possibly batteries)
    • Desk Mics vs. Fist Mics
    • Maths tower too noisy!


  • WebSDR, globaltuner through uni firewall
    • ASTRA happy to run as a globaltuner if possible
    • Phil is absent :(
  • Letter about FT-920
    • orchard may have a draft.
    • Phil is absent :(


  • Oakley Mast
    • Photos
    • Very long. Some surface corosion.
    • Where would we put it? Store it?


  • HF Contests
  • VHF Contests


  • Field days
    • IVARC is organising one and wants people.
    • El Pres says we need a vote.
    • Wait for more people to be present. (Phil in particular)


  • Generic Operating Day
    • Organise on short notice, after 3YP, to account for weather and rig availability.
    • Keep an eye on the IRC


  • Workshop specifically for AR kit.
    • Take a look at the lead acid batteries.
      • Building into power boxes?
      • RAYNET Battery Box
      • Batteries need testing. Sort out the bad ones.
      • PowerPole Connectors
    • Slim jims? Some still under construction.
    • Dummy Loads
      • Murray, Henry & Helios ==> Helios to send details to scorpia
    • Yagis
    • Schmendrick is interested in designing a CW HF rig.
    • Possible dates:
      • After 3YP -- due 1st May
      • After IRP/IRR -- ask orchard
      • When do exams end? -- End of Mayish
    • Operating afterwards?
  • Submit your availability here


  • Power Boxes
    • Budget
    • Schmendrick to figure out how this could be designed.


  • AOB - NOB

SOWN

19:00-20:00 SOWN Meeting (see agenda)

Joint Agenda

  • AOB