Workshop:2017/09/23: Difference between revisions

From SUWS-wiki
(Added update operating paperwork task.)
Line 40: Line 40:
* Finance review/checks
* Finance review/checks
* SOWN Zepler blog post
* SOWN Zepler blog post
* Update cheatsheets, manuals, etc. for operating paperowkr box.


=== Secondary Tasks ===
=== Secondary Tasks ===

Revision as of 13:23, 23 September 2017

[[|]] | Current Workshop:

 | 

[[|]]

Workshop (to be) held from 13:00-17:00 on 2017/09/23 in Mountbatten Common Room

 

A workshop to get everything setup and ready for the next academic year.

Saturday will be from about 1300 until dinner, Sunday will be all day (from about 11?)

Task list

Primary tasks

  • Cupboard and storage clean out
    • 32 level 3 (cupboard)
    • 53 level 3 (cupboard)
    • 42 level 1 (cage)
    • Dave's garage level 1


  • Prepare introductory events
    • Bunfight risk assessment
    • Get events onto the SUSU calendar
    • Intro Presentation
    • Ensure demos (PiSSTV) working
    • Email sign-up dev
    • Generally more detailed plans on which radio demos to do


  • Review inventory
    • 32 level 3 (cupboard)
    • 53 level 3 (cupboard)
    • 42 level 1 (cage)
    • Dave's garage level 1


  • Kit testing and maintenance
  • Finance review/checks
  • SOWN Zepler blog post
  • Update cheatsheets, manuals, etc. for operating paperowkr box.

Secondary Tasks

  • Club projects
    • HF Beam
    • Portable Mobile Operating Station
    • SOWN
    • SOWN-Zepler
    • Morse sounder
    • EDB
  • Outing recipies
  • Meeting and talk scheduling