Workshop:2016/09/24: Difference between revisions

From SUWS-wiki
No edit summary
 
Line 19: Line 19:
** '''32 level 3 (cupboard)'''
** '''32 level 3 (cupboard)'''
** '''53 level 3 (cupboard)'''
** '''53 level 3 (cupboard)'''
** 42 level 1 (cage)
** '''42 level 1 (cage)'''
** '''Dave's garage level 1'''
** '''Dave's garage level 1'''
***Has to be done on Saturday  
***Has to be done on Saturday  
Line 26: Line 26:
** '''Ensure demos (PiSSTV) working'''
** '''Ensure demos (PiSSTV) working'''
** '''Email sign-up dev'''
** '''Email sign-up dev'''
** Generally more detailed plans on which radio demos to do
** '''Generally more detailed plans on which radio demos to do'''
* Update inventory
* Update inventory
** '''32 level 3 (cupboard)'''
** '''32 level 3 (cupboard)'''
** '''53 level 3 (cupboard)'''
** '''53 level 3 (cupboard)'''
** 42 level 1 (cage)
** '''42 level 1 (cage)'''
** Dave's garage level 1
** Dave's garage level 1
**People involved  
**People involved  

Latest revision as of 16:39, 25 September 2016

[[|]] | Current Workshop:

 | 

[[|]]

Workshop (to be) held from 11:00-17:00 on 2016/09/24 in The Mary Campbell Room

 

A workshop to get everything setup and ready for the next academic year.

Note: This workshop is subject to rearrangement based on availability closer to the date.

Task list

Tasks in Bold are complete

Primary tasks

  • Cupboard and storage cleanout
    • 32 level 3 (cupboard)
    • 53 level 3 (cupboard)
    • 42 level 1 (cage)
    • Dave's garage level 1
      • Has to be done on Saturday
  • Prepare introductory events
    • Intro Presentation
    • Ensure demos (PiSSTV) working
    • Email sign-up dev
    • Generally more detailed plans on which radio demos to do
  • Update inventory
    • 32 level 3 (cupboard)
    • 53 level 3 (cupboard)
    • 42 level 1 (cage)
    • Dave's garage level 1
    • People involved
      • Someone with wiki access
  • Kit testing and maintenance

Secondary Tasks

  • club projects
    • HF Beam
    • PI-SSTV
  • Club laptop building