<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en-GB">
	<id>https://www.suws.org.uk/wiki/index.php?action=history&amp;feed=atom&amp;title=SUSU_Antenna_Array%2FTasks</id>
	<title>SUSU Antenna Array/Tasks - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://www.suws.org.uk/wiki/index.php?action=history&amp;feed=atom&amp;title=SUSU_Antenna_Array%2FTasks"/>
	<link rel="alternate" type="text/html" href="https://www.suws.org.uk/wiki/index.php?title=SUSU_Antenna_Array/Tasks&amp;action=history"/>
	<updated>2026-04-29T21:58:34Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.39.5</generator>
	<entry>
		<id>https://www.suws.org.uk/wiki/index.php?title=SUSU_Antenna_Array/Tasks&amp;diff=2915&amp;oldid=prev</id>
		<title>TylerWard: Created page with &quot;== NEW TASK LIST AT: https://github.com/SUWS/mast-planning/issues ==  == Pre issue tracker task list ==  === DESIGN WORK === * Finish CAD for antenna installation ** Assignee: Ty...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.suws.org.uk/wiki/index.php?title=SUSU_Antenna_Array/Tasks&amp;diff=2915&amp;oldid=prev"/>
		<updated>2015-07-12T15:55:22Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;== NEW TASK LIST AT: https://github.com/SUWS/mast-planning/issues ==  == Pre issue tracker task list ==  === DESIGN WORK === * Finish CAD for antenna installation ** Assignee: Ty...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;== NEW TASK LIST AT: https://github.com/SUWS/mast-planning/issues ==&lt;br /&gt;
&lt;br /&gt;
== Pre issue tracker task list ==&lt;br /&gt;
&lt;br /&gt;
=== DESIGN WORK ===&lt;br /&gt;
* Finish CAD for antenna installation&lt;br /&gt;
** Assignee: Tyler&lt;br /&gt;
** Dependencies: measurements for 70cm antenna plus various mounting brackets and cables.  Will probably need to have these in are possession to get accurate measurements for most of these.**&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Create installation plan and documentation for Estates and Facilities,&lt;br /&gt;
** Assignees: Tyler (with help from other)&lt;br /&gt;
** Dependencies complete (or near complete) CAD diagram&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Ordered set of instructions&lt;br /&gt;
*** List of tools required&lt;br /&gt;
*** Exploded diagrams to see how things are put together.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Plan how to connect FM dipole&lt;br /&gt;
** Assignees: unknown&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Find out the connectors used at each end of the FM dipole cable and how they are connected to the dipole itsled.&lt;br /&gt;
*** Source new connectors and appropriate length of suitable flexible cable.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== COMMUNICATION WORK ===&lt;br /&gt;
* Interact with SUSU to get final approval for mast.&lt;br /&gt;
** Assignees: David N and Tyler&lt;br /&gt;
** Dependencies: SUSU Director of services to get back to us.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Interact with Estates and Facilities to confirm they are happy with our plans&lt;br /&gt;
** Assignees: David N and Tyler&lt;br /&gt;
** Dependencies: Waiting final approval from SUSU.&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Check with E&amp;amp;F about lightning protection and wall mounting.&lt;br /&gt;
*** Check that no specific planning permission is required.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Organise with Estates and Facilities the erection of the mast.&lt;br /&gt;
** Assignees: David N and Tyler&lt;br /&gt;
** Dependencies:  Approval from SUSU and Estates and Facilities.  Final complete installation plans (although a date can be set before the final plan is ready)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== CABLING ===&lt;br /&gt;
* Measure cable in cage 9&lt;br /&gt;
** Assignees: undedecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Calculate cabling lengths&lt;br /&gt;
** Assignees: Tyler + 1 other&lt;br /&gt;
** Dependencies:  Access to the CAD diagram and ability to use it to calculate lengths:&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Determine all the cables we will need.&lt;br /&gt;
*** Use CAD diagram to calculate lengths&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Source coax connectors&lt;br /&gt;
** Assignee: unknown&lt;br /&gt;
** Dependencies: partially depends what cables are needed.&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Specify the type and quantity of coax connectors we need&lt;br /&gt;
*** Source these specified coax connectors.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Source network cabling&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: knowing the cable lengths required.&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Find ultra-violet resistant, flexible, shielded Ethernet cable (uncrimped) from WiFi dish to the junction box.&lt;br /&gt;
*** Find ultra-violet resistant, shielded Ethernet cable (uncrimped) from junction box to server rack.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Plan framework for cable mounting&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: knowing the lengths ans types of cable.&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Design and source parts for junction box.&lt;br /&gt;
*** Build junction box.&lt;br /&gt;
*** Determine how cables should be mounted along the mast / crossbeam and against the wall of SUSU.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== MOUNTING / ANTENNAS ===&lt;br /&gt;
* Design source and build mounting for Wi-fi dish&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Design mounting bracket that can mount dish at 90 degrees to standard mounting bracket.&lt;br /&gt;
*** Source parts needed for mounting bracket.&lt;br /&gt;
*** Build mounting bracket.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Finish HF dipole refurbishment&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
*** Clean the internals and other critical outstanding parts of existing HF fpole set of parts&lt;br /&gt;
*** Determine and spec out further parts needed for the HF dipole&lt;br /&gt;
*** Source further parts needed for the HF dipole.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Find mounting bracket for HF dipole&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
&lt;br /&gt;
* Find and purchase 70cm antenna for mast&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
&lt;br /&gt;
* Design or find and purchase 868Mhz antenna&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
&lt;br /&gt;
* find where we have hidden diplexer and test it&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Build polarity splitter for 2m beam&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* VNA testing&lt;br /&gt;
* Assignees: undecided&lt;br /&gt;
** Dependencies: Various cables need to be purposed and connectors attached and access to a VNA.&lt;br /&gt;
** Subtasks&lt;br /&gt;
*** VNA test 2m beam antenna cable&lt;br /&gt;
*** VNA test 868 antenna cable&lt;br /&gt;
*** VNA test triband cable&lt;br /&gt;
*** VNA test hf dipole cable&lt;br /&gt;
*** VNA test 70cm antenna cable&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Design and build improved water-proofing for Wi-Fi dish&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependecies: none&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Design water-proof housing&lt;br /&gt;
*** Source any parts consumables need to build and attach housing to dish&lt;br /&gt;
*** Build water-proof housing&lt;br /&gt;
&lt;br /&gt;
=== ROTATOR/FRAMEWORK ===&lt;br /&gt;
* Source main mast pole&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Identify rotator mounting options for existing wall brackets&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies:  Access to the AR drone video inxpecting the current mast and mountings.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Replace screws on azimuth rotator&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none (Screws already purchased)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Check elevation rotator mounting screws are not rusty&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies; none&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Plan and build rotator cable connections&lt;br /&gt;
** Assignnees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
** Sub tasks:&lt;br /&gt;
*** Determine how we should manage the various wires that make up the connector cable so we can provide a simple connection setup when Estates and Facilities put up the rotator.&lt;br /&gt;
*** Source components needed for connector&lt;br /&gt;
*** Build connector &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Design notification plaque to be placed at base of mast&lt;br /&gt;
** Assignees: undeciuded &lt;br /&gt;
** Dependencies: none&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Determine how the plaque will be made.&lt;br /&gt;
*** Determine what needs to go the mast: acknowledgements and safety / RF warnings.&lt;br /&gt;
*** Source the plaque (probably use laser cutter/etcher in ECS machine room)&lt;br /&gt;
&lt;br /&gt;
===INTERNAL ===&lt;br /&gt;
* Get permission from SUSU to instal server rack in the &amp;quot;playroom&amp;quot;&lt;br /&gt;
** Assignees: David N and Tyler&lt;br /&gt;
** Dependencies: Source the rack so we know exact dimensions and wall mounting options.&lt;br /&gt;
&lt;br /&gt;
* Design and build internal data/power patch panel&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
*** Sub tasks&lt;br /&gt;
*** Determine the data and power needs in the rack, how they should be organised and any likely expansion&lt;br /&gt;
*** Design patch panel&lt;br /&gt;
*** Source components needed for patch panel&lt;br /&gt;
*** Build and deploy patch panel.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Design internal RF patch panel&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: none&lt;br /&gt;
*** Sub tasks&lt;br /&gt;
*** Determine the RF needs for incoming cables  rack and any likely expansion&lt;br /&gt;
*** Design RF patch panel&lt;br /&gt;
*** Source components needed for PF patch panel&lt;br /&gt;
*** Build and deploy patch panel.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Determine how to stop the mast from being unplugged&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: Probably need the rack and mast deployed to see what likely vectors people will have for disconnecting..  However, can probably start accounting for obvious vectors immediately.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Plan how to rack mount existing kit&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: Possessing or at least knowing the specifications for all kit to be rack mounted.&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** Determine the best way of rack mounting each piece of equipment.&lt;br /&gt;
*** Source items need to rack mount equipment&lt;br /&gt;
*** Adapt sourced items when bespoke equipment needs to be rack mounted.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
* Make rack+contents look shiny&lt;br /&gt;
** Assignees: undecided&lt;br /&gt;
** Dependencies: All equipment being deployed or at least ready to be deployed in rack.&lt;br /&gt;
** Sub tasks&lt;br /&gt;
*** WTF?&lt;/div&gt;</summary>
		<author><name>TylerWard</name></author>
	</entry>
</feed>